Client: Bolton High School
Facility: Baseball, Softball, Soccer, Tennis Fields, Parking Areas


Annual Energy Savings Annual Cost Savings*  Fixtures Commissioned  Improved Lighting Levels 
224,208+ kWh/Yr $16,479+ 129 41%
 

PROJECT BACKGROUND

Bolton High School is rooted in athletic pride and community energy. As evening games became more central to the school’s events and culture, upgrading the lighting system was not just a functional need. It was a strategic step toward elevating game-time experience and field performance. 

To meet these evolving demands, the school introduced a modern LED system tailored to today’s athletic standards. The focus was not only on illumination but on creating a platform for smoother scheduling, enhanced field clarity, and improved spectator comfort. The new lighting also brought consistency and uniform brightness across key athletic and community zones without disrupting nearby areas.

IKIO’S END-TO-END APPROACH

IKIO approached the project with a sports-first lighting strategy, ensuring that every element from layout to install was optimized for performance, comfort, and sustainability. 

Site Assessment & Light Level Planning 

  • IKIO began by assessing the unique needs of each sports facility. Field dimensions, mounting structures, beam angles, and play dynamics were all factored into a precision-based lighting design. This ensured that every fixture contributed to both playability and safety.

High-Efficiency Fixture Deployment

  • The new system included IKIO’s 750W athletic lighting range, engineered specifically for sports environments. These fixtures deliver high-output performance while offering better optical control, reduced glare, and improved light placement. The design prioritized game-day clarity without causing spillover into surrounding spaces.

Control, Coordination & Installation 

  • To avoid interfering with academic or athletic schedules, installation was carefully planned in phases. Fixtures were pre-mounted and wired to minimize downtime. The process ensured that the school’s routine remained uninterrupted while the facilities received a complete lighting upgrade.

TECHNICAL SOLUTIONS DELIVERED

Application Zone  Legacy Issue  IKIO Solution  Performance Impact 
Trail Pathway (Full Route)  High-energy, uneven illumination  Directional optics with consistent output  Improved playability and player safety 
Pedestrian & Jogging Areas  Glare and over-lighting in some zones  Tailored angles for each sport's layout  Enhanced clarity and motion tracking 
Maintenance & Aesthetic  Rust-prone, outdated fixtures  Trail-rated area lighting  Smoother movement during events

STRATEGIC IMPACT

The upgrade has made it easier to plan and host evening games, giving the school greater flexibility in event scheduling. With improved lighting control, staff can now optimize usage based on sport, time of day, and facility needs. The system has also reduced operational complexity by minimizing maintenance demands and lowering energy loads. As a result, the school now operates a more efficient, reliable, and future-ready lighting solution that aligns with both sustainability efforts and community expectations.

CLIENT TESTIMONIAL

“The difference in lighting quality is night and day. Athletes feel more confident, fans enjoy a clearer view, and we’re saving on costs. The upgrade has given our field a new energy.” 
— Athletic Director, Bolton High School 

CONCLUSION

Bolton High School’s lighting upgrade stands as a forward-looking step in high school athletics bringing together performance, efficiency, and pride under one unified system. With minimal disruption and complete precision, this transformation shows what’s possible when light is engineered with purpose.